Civil Civil

  1. CIVIL WORKS
    1. Water supply design
      1. External water supply
      2. Water demand calculations;
      3. Pipe network analysis; and
      4. Hydraulics calculations.
    2. Sewerage Design
      1. External sewerage systems
      2. Understanding of sewege treatment plants and network pumping station.
    3. Road and highway designs
      1. Design to JKR Arahan Teknik and other relevant authorities
        1. Horizontal and vertical curves for road alignment;
        2. Acceleration, deceleration lanes and junction design;
        3. Super elevation design;
        4. Road pavement design
    4. Storm-water drainage design
      1. Design to Manual Baru Saliran Mesra Alam Malaysia (MSMA): Hydrologic design
        1. Estimation of Design Rainstorm
        2. Runoff Quality Controls
          • Detention;
          • Retention
        3. Runoff Conveyance
          • Open drains;
          • Pipe drains; and
          • Culverts and bridge crossings.
        4. Runoff Quantity Controls
          • Erosion and sediment control plans (ESCP);
          • Gross pollutant trap
          • Pumped Drainage
          • Sub-Soil Drainage
Page views:
Pages: 1  2  3